BC Visit 17th/18th Jan

leave a comment »

Testing out monitoring kit now that the house is less full of people. All works fine but installation was more organised than expected and all pulse meters are close together in services cupboard. this is a minor problem involving more wiring than expected.
Pulse block for gas meter has vanished so new one on order, and was tricky to get solarimeter into plane of solar array, along with location of external temp and RH so, a few more adjustments to the system will need to be made after the tenant has moved in and settled on furniture locations.

Advertisements

Written by Ben Croxford

January 18, 2011 at 2:11 pm

Posted in Uncategorized

BC visit 14th Jan _ Launch Day

with one comment

House open for visitors, all systems in and working, house looking good, just a few minor bits to do before hand over. About 30-40 visitors during the day, i would estimate, the services cupboard attracted most interest i would say

services cupboard

Visitors commenting with the architect on the external insulation system

 

Written by Ben Croxford

January 18, 2011 at 2:08 pm

Posted in Uncategorized

BC visit 6th Jan 2011

leave a comment »

Met Romeo from Rotex who was commissioning Rotex unit, Billy the plumber was commissioning Maico unit also so the services cupboard was full.
rotex unit is not that easy to get calibrated, odd in that it doesn’t have a room thermostat.
Possible issue of oversizing of boiler in Rotex, apparently it winds down to 8kW but this is perhaps high given expected heat loss of house.
Shower waste water heat recovery unit in place, discussion about how they may be best used in swimming pool showers where flow of waste water is high but highly dependent on usage of hot water as to payback time…
house very nearly finished now.

Written by Ben Croxford

January 13, 2011 at 11:10 am

Posted in Uncategorized

Tagged with ,