The Haringey PassivTerrace

winner of Retrofit for the Future

EP Visit 3rd Nov

with one comment

On the 3rd November the design team and the tenants  met on site to see the work progress. They then moved to Sandwood office to discuss other issues.

By this date the ground floor had been poured and insulated with 250mm insulation to give a U-value of 0.115 w/m2K:

insulation over ground floor slab

External insulation to rear facade had been placed:

detail of external insulation cut for rear door opening

Windows to the front of the house had been placed:

bay-window in the living room

The two remaining windows are due to be delivered next week, so hopefully we’ll have the opportunity to document how they are fitted with the membrane.

Advertisements

Written by elisa prestia

November 12, 2010 at 5:33 pm

Posted in Uncategorized

One Response

Subscribe to comments with RSS.

  1. 150mm jablite insulation is to the existing lower ground floor.
    The newly poured concrete floor to the upper ground floor has 250mm insulation to give a U-value of 0.115 w/m2K

    Jennie Swain - ATA

    November 12, 2010 at 6:04 pm


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: